Objet Alaris Preparation And Installation Manual - 1 Introduction
Alaris Site Preparation Guide
Objet Confidential and Proprietary Information
DOC-04002
5
Rev. C
1 Introduction
1.1 About this Guide
This document provides site preparation information and requirements
for Alaris 3‐D printing systems to ensure proper system installation and
operation. The customer is responsible for preparing the installation site
according to the instructions and guidelines described in this document.
The following topics are covered in this guide:
• Physical Description
• Shipment and Delivery
• Site Requirements
• Facility Requirements
• Site Preparation Checklist
Important:
Since site preparation activities must be completed before the
installation date, it is important for the customer to read this guide
thoroughly and to complete the Customer Site Preparation Checklist at
the end of this guide. On completion, the checklist should be faxed to
customer’s Objet contact person.
For special operating conditions or if you have any questions about the
site preparation procedure, contact your local Objet Geometries
representative.
1.2 Installation and Training
Installation and training take two work days:
• Basic installation and adjustment—
Covers the procedures described in the Alaris Installation Guide
(DOC‐04006)
• Operator training including practice under supervision—
Covers the operation and maintenance of the Alaris printer.