Pacific Energy Fusion Installation And Operating Instructions Manual - First Fire
19
070905-28
FSGA 5056.4221
First Fire
Manual
Operation
When lit for the first time, the appli-
ance will emit a slight odour for a
couple of hours. This is due to the
curing of paints, sealants and
lubricants used in the manufacturing
process. This condition is temporary.
Open doors and windows to ventilate
area. If optional fan kit has been
installed, place fan in the "OFF"
position. Smoke and fumes caused
by the curing process may cause
discomfort to some individuals.
It is normal for fireplaces fabricated of
steel to give off some expansion
and/or contraction noises during the
start up or cool down cycle. Similar
noises are found with your furnace
heat exchanger or cook stove oven.
See lighting instructions on page 18.
Once the burner has been lit, the
flame height can be adjusted by
rotating the flame adjustment knob.
Rotate the knob fully counter-
clockwise to give the high setting and
fully clockwise for the low setting.
Extended Shutdown:
To shutdown the appliance including
the pilot, partially depress and turn
gas valve knob clockwise past
"PILOT" to "OFF" position. DO NOT
FORCE.
NOTE: The control has an
interlock device which does not
allow the pilot to be lit when the
appliance is at operating
temperature. Let the appliance
cool down (approx. 60 sec.) before
attempting to relight the pilot.
DO NOT use force to rotate the
control knob.
Fig. #19
Fig. #19