SAB Goblin 700 Manual - page 25
Block Nut
(H0358-S)
Flat Head Cap
Screws M3x8mm
(HC134-S)
Linkage Tail
Support
(H0045-S)
Set Screw
M3x20mm
(HC150-S)
Yellow Carbon
Tail Boom (H9045-S)
Locking Element
Tail Assembly
Locking Element Tail Assembly .... X 2
Boom Spacer
(H0082-S)
Note:
Metric Hex Nylon Nut M3
(HC206-S)
DETAIL A
DETAIL C
Tail Boom Assembly
Locking Element Tail
(H0041-S)
Attaching H0082-S to the boom:
Pre-assemble the two boom spacers H0082-S with
the M3x20 socket set screw.
Insert into the boom tube completely done up.
Center the holes, then unscrew until there is contact with the walls
Lock everything with the adhesive.
Assemble H0040-S in the boom:
Before assembling the two parts in the boom we suggest tightening the
M2.5 screws into the two plastic parts to pre-thread them. In this way
when you will assemble the tail servo it will be easier to tighten the screws
into the plastic parts. Check the tail servo can fit, if necessary carefully sand
the hole.
Assemble H0045-S in the boom:
Before mounting H0045 on the boom we
suggest to first tighten the M2.5 screws into the
holes to thread them. In this way when you
assemble the part it will be easier to tighten the
screws.
Socket Head Cap
Screw M2.5x6mm
(HC018-S)
Tail Servo Lock
(H0040-S)
Double
Sided Tape
A
B
C
DETAIL B
BAG 14
Page 23
Chapter 12, Tail