Samsung AQ07P8GE Training Manual - page 34
Other manuals for AQ07P8GE:
Owner's Instructions Manual, Owner's Instructions Manual, Installation Manual, Service Manual
Manual is about: Wall mounted type
of
102
SAMSUNG | 33
INSTALLATION
5
Installation Diagram of Indoor Unit and Outdoor Unit
(Cont.)
6. Set valve cork of both liquid side and gas side of packed valve to the open
position.
7. Mount the valve stem nuts and the service port cap to the valve, and tighten
them at the torque of 18N.m with a torque wrench.
8. Check for gas leakage.
◆
At this time, especially check for gas leakage from 3-way valve’s stem nuts,
and from the service port cap.
B
(liquid)
Stem cap
Valve stem
A
(gas)
DB98_08187A(1)_S_23~56 3/27/03 2:41 PM Page 33