Wacker Neuson RCP 20 Operator's Manual - Maintenance
30
Maintenance
RCP
8
Maintenance
8.1
Maintenance schedule
Notify your WACKER contact in case of maintenance work which you cannot or
may not complete yourself.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety instructions of this operator's manual, see chapter
Safety information.
WARNING
Electrical voltage.
Injuries from electrocution.
f Remove the plug from the plug receptacle before all work on the machine.
Task
Daily
before
operation
As
required
Every
2 years
Check power cable for perfect
condition – if power cable is
defective, have it replaced.
Visual inspection of all parts
for damage.
Check knife for wear – if nec-
essary, replace knife.
Check screws on machine for
tightness – if necessary, tight-
en them.
Check the hydraulic oil tank
level for power loss or leaking
hydraulic oil – if necessary
add hydraulic oil.
Change hydraulic oil.