WaterRower M1 SERIES Owner's Manual - page 8
14
15
sTep 6
Insert one purification tablet (provided) now and every six months. Additional
purification tablets are available upon request at:
www.waterrowerservice.com/puritabs
Once completed, insert the Tank stopper; it may be necessary to moisten the
stopper to assist with replacement.
►
Please wipe excess water from wooden components after filling
►
If using blue dye, do not use a purification tablet.
sTep 7
Gently place the Tank Assembly Cover over the Top and Bottom Decks of the
Tank Assembly.
Fasten the Cover to the Tank Assembly using the Button Head screws. 2
screws go in on both sides of the Tank Assembly Cover.
screw x 2
Top Deck
Bottom Deck
sTep 8
Place the Footboard between the Rails.
sTep 9
Connect the base of the Footboard to the Rails using 2 of the Button Head
screws.
The bolt goes into the rail through the spacer on the inside of the Footboard,
similar in fashion to step Four.
sTep 10
Tilt the Footboard forward so it meets up with the Top Deck and the front of
the Tank Assembly Cover.
Attach the top of the Footboard to the Top Deck using the 2 Handle Rest Bolts
and Handle Rests.
Handle Rest x 2
Handle Rest Bolt x 2
Button Head screw x 2