3D Systems ProX DMP320 User Manual - page 68
of
83
68
3D SYSTEMS, INC
.
8 . When screen is fully tight bolts on both ends should be topped
out .
9 . Insert cyclone screener back into machine the same way it came
out .
10 . Fasten the end back on the machine lining it up the same way it
was when it was removed .
11 . Tighten levers to hold end on machine .
12 . Close hatch by tightening levers back up .
13 . The water lock filters the air that exits the sieving station. The
water contained in the water lock must be replaced on a weekly
basis . Unscrew the top of the water lock bottle, remove the
water and poor 300ml regular tap water in . Screw the top of the
water bottle back on and make sure the glass outlet tube inside
the bottle comes to the 100ml mark .