LaCie 12big Rack Fibre 8 Quick Install Manual - 6.3.
LaCie 12big Rack Fibre and expansion
Setup and Cabling/Completing the Installation
Quick Install Guide
page 9
Figure 13: Duplex Expansion: Dual RAID Controller Enclosure with
Two Expansion Enclosures Attached (Dual HBAs)
Completing the Installation
6.
6.1. Connecting the Power Cords
Connect the power supply cords to the power source
1.
and to each power supply.
Secure the strain relief bales. The bale fits over and onto
2.
the cord.
Figure 14: Connecting the AC Power Cords to the PDU
6.2. Powering On the System
Before powering up the 12big fibre and expansion enclo-
sures, please ensure that all the modules are firmly seated in
their correct bays. All three power supplies must be installed
in order to power up the enclosure.
WaRninG:
The 12big rack fibre or expansion enclosure
MUST be grounded before applying power.
cauTion:
Do not operate the system until the ambient tem-
perature is within the specified operating range. If the disks have
been recently installed, ensure they have had time to acclimatize
before operating them.
iMPoRTanT:
The power cords are used as the main disconnect,
the Power On/Standby switch does not fulfill this requirement.
Initial Setup of Embedded
6.3.
StorView
On first startup of the embedded StorView module, you will
need to configure the network settings. By default the embed-
ded module will look for a DHCP server to obtain an IP ad-
dress. If one is not found, it will search to determine if an IP
address had been previously assigned.
If an address was not previously assigned, then the system de-
faults to an IP address of:
10.1.1.5 for the lower RAID Controller (Controller 0 (A))
✦
10.1.1.6 for the upper RAID Controller (Controller 1 (B))
✦
10.1.1.7 if an error is detected
✦
Subnet Mask is 255.0.0.0
✦
During the process of configuring an embedded module, you
will be required to enter a “new” password and confirm that
password. The default password is “password.” See step 6
later in the procedure.