NorthStar 951X Installation Manual - page 29
SECTION TWO - Installing the unit
951/952 INSTALLATION MANUAL Revision B
Page 19
Figure 8: Stripping the coax cable jacket
2. See Figure 9: ”Flared cable braid,” below: Slide outer fer-
rule on as shown. Slightly flare the end of cable braid,
as shown, to facilitate insertion into inner ferrule.
Figure 9: Flared cable braid
3. Place center contact onto center conductor so that it
butts against the cable dielectric. Crimp the contact in
place using Amphenol tool handle #227-944 and Cavity
B of Die Set 227-980-3.
4. Install cable assembly into body assembly so inner fer-
rule slides over dielectric and under braid. Push cable
assembly forward until contact seats in insulator. Slide
outer ferrule over braid and up against connector body.
Crimp outer ferrule using Cavity A of tools specified
above. The connector ferrule-to-cable junction can be
sealed and protected using adhesive-lined heat shrink.
Figure 10: Completed BNC connector
Installing the
AN205-P antenna
The AN205-P combo antenna provides for an easier, more compact, and
more attractive installation, and in many cases, the loop antenna’s design
improves the noise rejection of signals interfering with differential signals.