Wacker Neuson LTV6K Operator's manual - Machine Setup
Manual is about: Light Tower
60 Hz
of
110
wc_tx004430gb_FM10.fm
36
Machine Setup
LTV
4
Machine Setup
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine! Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.