Wacker Neuson LTV6K Operator's manual - Ltv
wc_tx004431gb_FM10.fm
65
LTV
Operation
Continued from the previous page.
Operating the
lights
Perform the procedure below to operate the lights.
1. Turn on the main circuit breaker (a).
2. Turn on individual circuit breakers (c) one at a time.
Notes
■ Metal halide floodlights require a warm-up time of 5–15 minutes before they
reach full brightness.
■ After turning the lights off, a cool-down time of 10 minutes is necessary before
they can be turned on again.
NOTICE: Turn off the lights before stopping the machine. Failure to do so may
damage the generator.
Stopping the
machine
Perform the procedure below to stop the machine.
1. Remove all connected loads from the machine.
2. Turn the circuit breakers (a, b, c) off.
3. Rotate the starting key (e) to the “OFF” position.
wc_gr013753
a
b
c
f
e