General Maintenance
7.2
Periodic Maintenance Schedule
The table below lists basic machine maintenance. Tasks designated with check
marks may be performed by the operator. Tasks designated with square bullet
points require special training and equipment.
1
Every 600 hours or 12 months.
Daily
before
starting
Every
250 hours
or
3 months
Every
500 hours
or
6 months
Every
1000 hours
or
1 year
Other
Check external hardware.
Check for fluid leaks.
Check all fluid levels.
Clean the machine inside
and out.
Replace battery.
Grease axle.
1