Jacuzzi J - 355 Owner's Manual - J-300 Series
J-300 Series
9. Select the power supply inlet you want to use (Figure A). Feed power cable
to control box, then install it through the large opening provided in the
bottom side of the box.
10. Connect wires, color to color, on terminal blocks TB1 and TB3 (Figure C,
). TIGHTEN SECURELY! All wires must be hooked up securely or
damage could result.
11. Install control box door and screws and reinstall the cabinet side panels.
Figure A
Equipment Area
10
4
3
7
1
2
2
Flow
Note: Pump Locations Vary by Model
Circulation Pump
Behind Load Box
8
5
6
6
9
11
1. Control Box
2. Power Supply Entrance(s)
3. 2-Speed Jets Pump #1
4. Heater
5. Spa Drain Valve
6. Pump Drain Plugs(s)
7. 1-Speed Jet Pumps #2
8. Circulation Pump
9. Optional CD Ozonator (Purchase
Seperately)
10. Factory Installed Ozone Injector
11. Control Panel
Figure B Control Box
TB1
3
2
1
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
13