First Time Power-Up and Start-Up
5
CFW-11 | 5-1
5 FIRST TIME POWER-UP AND START-UP
This chapter describes how to:
- Check and prepare the inverter before power-up.
- Power-up the inverter and check the result.
- Set the inverter for the operation in the V/f mode based on the power supply and motor information by using
the Oriented Start-Up routine and the Basic Application group.
NOTE!
In order to use the inverter in VVW or vector control modes, and for other available functions, refer
to the CFW-11 programming manual.
ATTENTION!
Firmware version V5.00 or higher CANNOT be used on inverters with control board revision prior
to "D".
Any firmware version prior to V5.00 CANNOT be used on inverters with control board revision "D"
or higher.
5.1 START-UP PREPARATION
The inverter must have been already installed according to the recommendations listed in
Chapter 3
INSTALLATION AND CONNECTION on page 3-1
. The following recommendations are applicable even if
the application design is different from the suggested control connections.
DANGER!
Always disconnect the main power supply before performing any inverter connection.
DANGER!
Débranchez toujours l'alimentation principale avant d'effectuer une connexion sur le variateur.
1. Check if power, grounding, and control connections are correct and firmly secured.
2. Remove from inside the inverter or the cabinet all the materials left behind from the installation work.
3. Verify the motor connections and if its voltage and current are within the inverter rated values.
4. Mechanically uncouple the motor from the load:
If the motor cannot be uncoupled, make sure that any speed direction (forward or reverse) will not result in
personnel injury and/or equipment damage.
5. Close the inverter or cabinet covers.