Wood Stone WS-MH-RFG-IR Installation And Operation Manual - Assembly
Questions? Call Wood Stone at 800-578-6836
12
MH-RFG-IR Installation and Operation Manual
September
2006
a. Once the oven has been set in place, cover wire mesh and metal
lathing with no less than one inch of stucco (see page 16 for diagram
and stucco formulae).
ASSEMBLY
ASSEMBLY
1. Mount the oven mantle (if provided) using the hardware provided.
on page 13).
2. Mount the stainless steel toe kick to the front of the oven stand, near the
floor using the hardware provided (See figure on page 14). If your oven
was shipped with a lower facade extension there is no toe kick required.
3. Mount the service/intake panel to the brackets on the front of the stand,
directly below the doorway, using the hardware provided (See figure on
page 14, if your oven was shipped with the optional facade extensions, see
page 15).
a. Do not obstruct the flow of combustion and ventilation air between the
toe kick and the bottom of the service/intake panel.
b. This panel is the only access for servicing the gas and electrical
components of the oven so it must be left accessible and removable.
4. The following applies to stucco finish ovens only (Models ending with S):