Burner Operation Sequence
GG or RFG-IR Oven - Touchpad Controller
Power On
SV2 valve powers igniter
and opens pilot valve
for radiant (rear) burner.
Pilot Lights
Pilot does not light, SV2
times out
SV2 senses pilot
flame, igniter off, SV2
opens, burner lights,
dome flame indicator
light comes on.
Radiant burner
remains on until appliance
is turned off.
Floor Temp. above set
point, then controller does
not power SV1 (underfloor
burner).
Floor Temp. below set
point - Controller sends power
to SV1, SV1 powers igniter and
opens pilot valve.
Pilot lights, SV1 senses
pilot flame, igniter off, hearth
heat light on, SV1 opens,
underfloor burner lights
Floor reaches the set point
Temp. Controller turns off
power to SV1 and underfloor
burner shuts off.
Pilot does not light,
SV1 times out, Touchpad
controller flashes ‘chec’
Operation Sequence