8. REPAIR/SERVICE SCHEDULE
Saeco International Group
REV.4 SEPT.2003
Page 1/2
1. Repairs schedule:
The repairs schedule, together with the service schedule, lists all relevant activities to be
performed in an efficient sequence.
Activity
1
Visual check (transport damage)
2
Record of machine data
3
Functional check / Error analysis
4
Opening of machine
5
Visual check (leakages)
6
Mechanical systems check (functional test)
7
Defect detection
8
Modifications check
9
Service operations according to service schedule
10
Internal cleaning
11
Functional test (with open machine / leakage test)
12
Assembly
13
Final test according to test schedule
14
Steam off (winter)
15
External cleaning
16
Lubrication of brewing unit
17
Insulation test
18
Documentation
2. Service schedule:
Service activities
R = Replace
C = Clean
VC = Visual check
AT = Acoustic test
D = Descale
A = Adjustment
Component
Activity
Equipment
Water filter
R
Lip seal / Water tank
R
Coffee return flow valve
R
Valve spring
R
Valve plug O-ring
R
Valve plug O-ring
R
Filter (brewing unit)
C / VC
Grease solvent
Hose connections
VC
Pump
VC / AT
Gearmotor
AT / VC
Grinder
C / A
Vacuum cleaner / brush
Doser
C
Vacuum cleaner / brush
Water circuit
D
Descaler (Saeco)
HWS valve
VC / R
Water outlet (valve plug)
C
Grease solvent / brush
O-ring (boiler connection /
instantaneous water heater)
R