Commissioning
Sentinel Kinetic MVHR Installation & Commissioning
30
Commissioning
Overview
The instructions in this section are intended to provide configuration and operation information for setting up the
equipment. In the event of problems, see Troubleshooting on page 45
Follow good practice when commissioning the unit. Ensure that the system is installed according to the system
designers intent incorporating any acoustic ducting, that all joints are air tight, ducting is well supported, bends
are avoided close to vents, and that the vent valves are fully open at the start of the commissioning process.
The following is attached to the unit and should be used as a check list prior to setting the air flows.