DAELIM VJF125 Service Manual - A.C. Generator Charging
Other manuals for VJF125:
Service Manual
of
288
17-6
BATTERY/CHARGING SYSTEM
REMOVAL/INSTALLATION
Disconnect the regulator/rectifier coupler.
Remove the regulator/rectifier unit mounting bolts and
regulator/rectifier.
Install the reguator/rectifier unit in the reverse order of
removal.
A.C. GENERATOR CHARGING
COIL INSPECTION
Remove the seat. (⇨
13-2
)
Remove the LH. side cover. (⇨
13-2
)
Disconnect the A.C generator cord coupler.
Measure the resistance between the yellow leads.
RESISTANCE VALUE : 0.1~1.5
Ω
(20
℃
)
If the resistance values are much larger than the
specified value, or if there is continuity between
terminals and earth terminals, replace the stator with a
new one.
• Install in the reverse order of removal.
•This test is done with the starter mounted to the
engine.