Canon Color imageRUNNER C4580 Service Manual - page 447
of
851
Chapter 11
11-10
11.2.2.3 At Power-On(Fixing belt 100deg C or more)
In fixing start-up sequence (fixing belt 100 deg C or more), turn on IH heater and pressure heater at power on,
control the temperatures of the fixing/pressure belts so that they reach their target temperatures.
When the fixing/pressure belts reach their target temperature, the machine moves to the standby mode.
F-11-7
0
100
IH Heater
STBY
WMUP
1
(M24)
(H1)
1
2
3
4
2