Panasonic Workio DP-C401 Service Handbook - page 52
2-27
Chapter 2 Maintenance
(Fig. 4) j0mf41827
6.
Install the tool in the frame tool hole to make sure that the frame tool hole and Full Rate
Carriage tool hole are aligned with each other (at front and rear). (Fig. 5)
(1) Install the tool (at front and rear).
(2) Secure the tool with the screw.
(Fig. 5) j0mf41828
(1) Loosen the screws and move the Full Rate Carriage to align the tool holes (at front
and rear).
(Fig. 6) j0mf41829
Change the position where the pulley is fixed if the Half Rate Carriage tool hole cannot
be aligned with the Rail tool hole causing the tool installation to be impossible. (Fig. 4)
Loosen the Carriage Cable fixing screws to align the tool holes with each other if the
frame tool hole cannot be aligned with the Full Rate Carriage tool hole causing the tool
installation to be impossible (at front and rear). (Fig. 6)