DAELIM VJF125 Service Manual - page 199
14-19
FRONT WHEEL/FRONT FORK/STEERING
INSTALLATION
Install the fork pipe through the bottom bridge, fork
top bridge and handle pipe.
Position the marking line of the fork pipe with the
upper surface of the top bridge as shown.
Tighten the bottom bridge pinch bolt to the specified
torque.
TORQUE : 3.4 kgf
m (34 N
m)
Tighten the fork cap bolt to the specified torque.
TORQUE : 2.3 kgf
m (23 N
m)
Tighten the fork top bridge pinch bolt to the specified
torque.
TORQUE : 2.6 kgf
m (26 N
m)
Tighten the handle pipe pinch bolt to the specified
torque.
TORQUE : 2.6 kgf
m (26 N
m)
Install the following.
- Front wheel. (
14-7)
- Front fender. (
13-5)
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE
FORK TOP BRIDGE