Riverbed Steelhead CX Series Installation Manual - page 26
22
Rack Installation Guide
Installing Steelhead CX, DX, EX, Granite, and Cascade Systems
Working With 1U and 2U CX, DX, EX, Granite, and Cascade
For the medium position, align the left screw hole on the bracket with the hole second from the left on
the outer rail and secure with three screws.
Figure 1-25. Medium Bracket Position
For the long position, align the left screw hole on the bracket with the hole on the left on the outer rail
and secure with three screws. Add the short reinforcement bracket and secure with two screws.
Figure 1-26. Long Bracket Positions
You need to adjust the position of the ball bearing slider and the oval access area to access the positions
for these screws.
Mounting the System
After you have detached the outer rails from the inner rails on the chassis and adjusted the length of the
outer rails to fit your rack posts, you are ready to install the outer rail assemblies to the rack.
Important:
All 2U systems must be mounted to a four-post rack; they cannot be mounted to a two-post rack.
Caution:
2U systems weigh 58 lb (23.36 kg). A minimum of two people is required to move a 2U system. Lift the system
using both hands and with your knees bent.
To mount the appliance to a four-post rack
1.
Install the outer rails to the rack posts with the included screw set.
Standard Bracket
Short Bracket