Riverbed Steelhead CX Series Installation Manual - page 39
Rack Installation Guide
35
Mounting 3U Steelhead xx50, WWA-x10, and WWA-xx10 Systems in a Rack
Installing Steelhead xx50 and Whitewater xx10
Important:
All 3U systems must be mounted to a four-post rack; they cannot be mounted to a two-post rack.
Caution:
3U systems weigh from 59-71 lbs. (26-33 kg). A minimum of two people is required to move a 3U system. Lift
the system using both hands and with your knees bent.
Note:
The outer rails are not required to install the system in a shelving unit. Remove the outer rails before attempting
to install the Series xx50, WWA-x10, and WWA-xx10 in a shelving unit.
Unplug the AC power cords.
Remove all external devices and connectors.
Important:
If your rack has square holes, use the included square-hole post adaptors. For details, see
“Square Post-Hole
Adaptor” on page 1
.
To detach the outer rails from the inner rails
1.
To detach the outer rails, slide the outer rail to the end of the system, pull the outer rail release tab
towards the front of the system and pull the outer rail completely away from the system.
Figure 2-16. Releasing the Outer Rail
To adjust the length of the outer rails
1.
To adjust the length of the outer rails to fit the distance between your rack posts, loosen the screws on
the longer rear bracket of the outer rails. You can tighten and secure the bracket screws after you have
affixed the outer rails to the rack posts.