Server Technology Switched Rack PDU Installation And Operation Manual - Chapter 2: Installation
10 Installation Switched PDU
Installation and Operations Manual
Chapter 2: Installation
Before installing your Switched Rack Power Distribution Unit, refer to the following lists to make sure you have all
the items shipped with the unit, as well as other items needed for proper installation.
Standard Accessories
Mounting Hardware
Vertical Models:
Button mounting kit with M4 screws.
Horizontal Models:
Two removable L-brackets with four M4 screws.
Expansion Models:
RJ12 to RJ12 crossover cable.
Additional Items for Models with C20 Inlets
Separate power input.
Optional power input retention bracket hardware (can be installed); two removable T-brackets with two 40 mm
screws per input.
Note: This bracket is not compatible with Server Technology Input Power Cords with the self-locking C19
feature. These power cords have the prefix PTCORD-L#.
Optional Accessories
Temperature/humidity sensors (Part Number EMTH-1-1).
Environmental monitor (Part Number EMCU-1-1B).
Vertical mounting brackets; additional mounting options are available in the Accessories section of the
Server Technology website at
Additional Required Items
Flathead and Phillips screwdrivers.
Screws, washers, and nuts to attach the PDU to your equipment rack.