Outlet Administration
Setting the sequencing interval:
The Set Outlet SeqInterval commands sets the power on sequencing interval for all outlets.
To set the sequencing interval:
At the Switched CDU: prompt, type set outlet seqinterval all, followed by a value from 0 to 15 (in seconds) and
press Enter.
Setting the reboot delay:
The Set Outlet Reboot DeLay commands sets the reboot delay for all outlets.
To set the sequencing interval:
At the Switched CDU: prompt, type set outlet rebootdelay all, followed by a value from 5 to 60 (in seconds) and
press Enter.
Creating a descriptive outlet name:
The Set Outlet Name command assigns a descriptive name to an outlet. You can use this name in commands that
require an outlet name as an alternative to using the outlet’s absolute name.
To create an outlet name:
At the Switched CDU: prompt, type set outlet name followed by the absolute outlet name, then a descriptive name of
up to 24 alphanumeric and other typed characters - (ASCII 33 to 126 decimal) are allowed; spaces are not allowed;
outlet names are not case sensitive. Press Enter.
Example
The following command adds the descriptive name DataServer_1 to outlet .a1:
Switched CDU: set outlet name .a1 DataServer_1
Setting the outlet wakeup state:
The Set Outlet Wakeup command set the default wakeup state for that outlet. In the event of a system-wide power
loss, this state will be applied to the outlet when power is restored.
The wakeup state can be set to On, Off, or Last. Upon restoration of system power; If set to On, the PDU will apply
power to that outlet. If set to Off, the PDU will not apply power to that outlet. If set to Last, the PDU will apply the last
known power state.
To set the wakeup state:
At the Switched CDU: prompt, type set outlet wakeup, followed by on, off or last and the outlet name. Press Enter.
Example
The following command sets the wakeup state for outlet .a1 to off:
Switched CDU: set outlet wakeup off .a1
Setting the outlet post-on delay:
The Set Outlet PostOnDelay command is used set the Post-On delay for an outlet. This feature allows the
administrator to manage boot dependencies during power-on sequencing or group commands by delaying the
sequencing of subsequent outlets after an outlet has been powered on.
NOTE: The Post-On delay is applied in addition to the general sequencing interval.
To set the outlet Post-On delay
At the Switched CDU: prompt, type set outlet postondelay, followed by a value from 0 to 900 (in seconds) and press
Enter.
Example
The following command sets the Post-On delay for outlet .a5 to 90 seconds:
Switched CDU: set outlet postondelay .a5 90