Jeep 1996 Grand Cherokee Service Manual - page 1192
(9) Turn upper housing around and remove limit
valve and shift valve covers (Fig. 94).
(10) Remove limit valve housing. Then remove
retainer, spring, limit valve, and 2-3 throttle plug
from limit valve housing (Fig. 94).
(11) Remove 1-2 shift control valve and spring
(Fig. 94).
(12) Remove 1-2 shift valve and spring (Fig. 94).
(13) Remove 2-3 shift valve and spring from valve
body (Fig. 94).
(14) Remove pressure plug cover (Fig. 94).
(15) Remove line pressure plug, sleeve, throttle
pressure plug and spring (Fig. 94).
VALVE BODY LOWER HOUSING DISASSEMBLY
(1) Remove timing valve cover.
(2) Remove 3-4 timing valve and spring.
(3) Remove 3-4 quick fill valve, spring and plug.
(4) Remove 3-4 shift valve and spring.
(5) Remove converter clutch valve, spring and plug
(Fig. 95).
(6) Remove converter clutch timing valve, retainer
and valve spring.
3-4 ACCUMULATOR HOUSING DISASSEMBLY
(1) Remove end plate from housing.
(2) Remove piston spring.
(3) Remove piston. Remove and discard piston
seals (Fig. 96).
VALVE BODY ASSEMBLE
CAUTION:
Do not force valves or plugs into place
during reassembly. If the valve body bores, valves
and plugs are free of distortion or burrs, the valve
body components should all slide into place easily.
In addition, do not overtighten the transfer plate
and valve body screws during reassembly. Over-
tightening can distort the housings resulting in
valve sticking, cross leakage and unsatisfactory
operation. Tighten valve body screws to recom-
mended torque only.
LOWER HOUSING ASSEMBLY
(1) Lubricate valves, springs, and the housing
valve and plug bores with clean transmission fluid
(Fig. 95).
(2) Install 3-4 timing valve spring and valve in
lower housing.
(3) Install 3-4 quick fill valve in lower housing.
(4) Install 3-4 quick fill valve spring and plug in
housing.
Fig. 94 Upper Housing Shift Valve And Pressure Plug Locations
ZJ
TRANSMISSION AND TRANSFER CASE
21 - 53
DISASSEMBLY AND ASSEMBLY (Continued)