Jeep 1996 Grand Cherokee Service Manual - page 1195
(2) Assemble regulator valve line pressure plug,
sleeve, throttle plug and spring. Insert assembly in
upper housing and install cover plate. Tighten cover
plate screws to 4 N·m (35 in. lbs.) torque.
(3) Install 1-2 and 2-3 shift valves and springs.
(4) Install 1-2 shift control valve and spring.
(5) Install shift valve cover plate.
(6) Install shuttle valve as follows:
(a) Insert plastic guides in shuttle valve second-
ary spring and install spring on end of valve.
(b) Hold shuttle valve in place.
(c) Compress secondary spring and install E-clip
in groove at end of shuttle valve.
(d) Verify that spring and E-clip are properly
seated before proceeding.
Fig. 103 Installing Lower Housing On Transfer Plate
And Upper Housing
Fig. 104 Shuttle And Boost Valve Components
Fig. 102 Lower Housing Separator Plate
21 - 56
TRANSMISSION AND TRANSFER CASE
ZJ
DISASSEMBLY AND ASSEMBLY (Continued)