Jeep 1996 Grand Cherokee Service Manual - page 70
LOWER BALL STUD REPLACEMENT
(1) Position tools as shown to remove and install
ball stud (Fig. 12). Because there are two different
designs for the lower ball studs try both installers for
proper fit.
KNUCKLE INSTALLATION
(1) Position the steering knuckle on the ball studs.
(2) Install and tighten the bottom retaining nut to
109 N·m (80 ft. lbs.) torque. Install new cotter pin.
(3) Install and tighten the top retaining nut to 101
N·m (75 ft. lbs.) torque. Install new cotter pin.
(4) Install the Hub Bearing and Axle Shaft accord-
ing to the installation procedure.
(5) Reconnect the tie–rod or drag link end onto the
steering knuckle arm. Install the ABS sensor wire
and bracket to the knuckle, refer to Group 5 Brakes.
AXLE BUSHING REPLACEMENT
Refer to Axle Bushing Replacement in the Front
Suspension section.
DIFFERENTIAL
REMOVAL
To service the differential the axle assembly and
axle shafts must be removed. Refer to the removal
procedures in this Group.
(1) Note the installation reference letters stamped
on the bearing caps and housing machined sealing
surface (Fig. 13).
Fig. 12 Lower Ball Stud Remove/Install
Fig. 13 Bearing Cap Identification
ZJ
DIFFERENTIAL AND DRIVELINE
3 - 25
REMOVAL AND INSTALLATION (Continued)