Rauch QUANTRON-A Instruction Manual - page 43
Operation QUANTRON-A
37
4
4.5.6
Calibration
In this menu, you can determine the flow factor based on a calibration and save
it in the control unit.
Carry out calibration:
Before spreading for the first time.
If the fertiliser quality has changed significantly (moisture, high dust content,
cracked grain).
If a new fertiliser type is used.
The calibration must be conducted with engaged PTO at a standstill or during
travel over a test track.
Remove both spreading discs.
Set the drop point to calibration position (DP 0).
Entering the working speed:
1.
Open the
Fertiliser settings > Start calibration
menu.
2.
Enter the average working speed.
This value is required for calculation of the slide position during calibration.
3.
Press the
Enter key
.
The new value is saved in the control unit.
The
Move to drop point
alarm message appears in the display.
4.
Press the
Start/Stop
key.
The drop point is activated.
The alarm is cleared.
The
Prepare calibration
operating screen is displayed.
NOTICE
The
Calibration
menu is locked for the
M EMC function
and in the
AUTO km/h + AUTO kg
operating mode. This menu point is inactive.
n
CAUTION
Risk of injury due to automatic drop point adjustment
With machines equipped with electrical drop point actuators, the
Move to drop point
alarm message appears. Upon activation of
the
Start/Stop
key, the drop point is automatically moved to the
preset value by means of the electrical actuating cylinders. This
may cause injury and property damage.
Before actuating the
Start/Stop
key, ensure that
nobody
is
present in the danger zone of the machine.