Jeep Cherokee 2000 Service Manual - page 1069
(12) Place kickdown limit valve body and end plate
in position on valve body and compress springs (Fig.
107).
(13) Install screws to attach kickdown limit valve
body to valve body (Fig. 107).
(14) Install shuttle valve throttle plug, primary
spring and shuttle valve into valve body (Fig. 107).
Verify valve components slide freely.
(15) Install 1-2 and 2-3 shift valve governor plugs
into valve body (Fig. 107). Verify valve components
slide freely.
(16) Place governor plug end plate in position on
valve body and compress spring.
(17) Install screws to attach governor plug end
plate to valve body (Fig. 107).
(18) Assemble shuttle valve spring and guides
(Fig. 107). Place spring and guides in position on
shuttle valve stem.
(19) Compress spring and install E-clip in groove
on shuttle valve stem (Fig. 108).
(20) Place shuttle valve end plate in position on
valve body (Fig. 109).
(21) Install screws to attach shuttle valve end
plate to valve body (Fig. 109).
(22) Install rear clutch servo and rear servo check
balls in proper cavities in transfer plate (Fig. 110).
(23) Insert filter into opening in separator plate
(Fig. 111).
(24) Place separator plate in position on transfer
plate and install screws to attach separator plate to
transfer plate (Fig. 111).
(25) Place one 11/32 in. check ball and six 1/4 in.
check balls in the proper cavities in the valve body
(Fig. 112).
(26) Place transfer plate in position on valve body
(Fig. 113).
(27) Install screws to attach transfer plate to valve
body (Fig. 113).
(28) Turn valve body over to expose the separator
plate.
(29) Insert converter clutch valve and spring into
converter clutch valve module (Fig. 114). Verify valve
components slide freely.
(30) Insert spring and fail-safe valve into converter
clutch valve module (Fig. 114). Verify valve compo-
nents slide freely.
(31) Place cover plate in position on converter
clutch valve module (Fig. 114).
(32) Install screws to attach cover to converter
clutch valve module (Fig. 114).
Fig. 108 Shuttle Valve E-Clip And Secondary Spring
1 – E-CLIP
2 – SECONDARY SPRING AND GUIDES
3 – SHUTTLE VALVE
Fig. 109 Shuttle Valve End Plate
1 – VALVE BODY
2 – SHUTTLE VALVE END PLATE
Fig. 110 Rear Servo and Rear Clutch Check Balls
1 – REAR SERVO CHECK BALL
2 – TRANSFER PLATE
3 – REAR CLUTCH CHECK BALL
XJ
AUTOMATIC TRANSMISSION—30RH
21 - 161
DISASSEMBLY AND ASSEMBLY (Continued)