Jeep Cherokee 2000 Service Manual - page 1081
fully engaged in slots of driving shell after installa-
tion.
(36) Engage front band on adjusting screw and
hold band in place.
(37) Install strut between band lever and front
band (Fig. 158).
(38) Tighten front band adjusting screw until band
just grips clutch retainer. Verify that front/rear
clutches are still seated before continuing.
(39) Verify that reaction shaft support hub seal
rings are hooked together (Fig. 159).
(40) Coat front clutch thrust washer with petro-
leum jelly to hold it in place. Then install washer
over reaction shaft hub and seat it on pump (Fig.
160).
CAUTION: The thrust washer bore (I. D.), is cham-
fered on one side. Make sure the chamfered side is
installed so it faces the pump.
Fig. 156 Front Band
1 – FRONT BAND
2 – TRANSMISSION HOUSING
Fig. 157 Installing Front/Rear Clutch
1 – FRONT BAND
2 – FRONT CLUTCH AND DRUM
3 – TRANSMISSION HOUSING
4 – REAR CLUTCH
Fig. 158 Front Band Linkage Installation
1 – BAND LEVER
2 – BAND STRUT
3 – FRONT BAND
Fig. 159 Reaction Shaft Support Seal Rings
1 – REACTION SHAFT SUPPORT HUB
2 – FRONT CLUTCH THRUST WASHER
3 – SEAL RINGS
XJ
AUTOMATIC TRANSMISSION—30RH
21 - 173
DISASSEMBLY AND ASSEMBLY (Continued)