Jeep Cherokee 2000 Service Manual - page 977
Other manuals for Cherokee 2000:
Service Manual
of
1528
(8) Install front thrust washer on shaft and slide
washer up against gear and over lock ball (Fig. 89).
(9) Install wave washer, flat washer and remain-
ing snap ring on idler shaft (Fig. 89). Be sure snap
ring is fully seated.
Fig. 86 Correct Synchro Sleeve Position
1 – DOUBLE GROOVE FORWARD
2 – GROOVE FORWARD
3 – FIRST GEAR SIDE MARKING TOWARD FIRST GEAR
4 – TAPER FORWARD
5 – GROOVE FORWARD
6 – 5TH-REV SYNCHRO SLEEVE
7 – 1–2 SYNCHRO SLEEVE
8 – 3–4 SYNCHRO SLEEVE
Fig. 87 Idler Gear And Bearing Installation
1 – IDLER GEAR
2 – BEARING
3 – LOCK BALL
4 – REAR OF SHAFT
Fig. 88 Idler Gear Rear Thrust Washer Installation
1 – LOCK BALL
2 – SNAP RING GROOVE
3 – THRUST WASHER
XJ
NV3550 MANUAL TRANSMISSION
21 - 69
DISASSEMBLY AND ASSEMBLY (Continued)