Jeep Cherokee 2000 Service Manual - page 1190
(17) Align rear planetary-output shaft assembly
teeth with case slots and install assembly in case
(Fig. 141).
(18) Install rear planetary snap ring with snap
ring pliers. Chamfered side of snap ring faces up and
toward case front (Fig. 142).
(19) Check first–reverse brake pack clearance with
feeler gauge (Fig. 143). Clearance should be 0.70 –
1.20 mm (0.028 – 0.047 in.). If clearance is incorrect,
planetary assembly, thrust bearing or snap ring is
not properly seated in case. Remove and reinstall
components if necessary.
(20) Install second brake piston sleeve (Fig. 144).
Sleeve lip faces up and toward case front as shown.
(21) Install second brake drum gasket.
Fig. 139 Installing Thrust Bearing And No. 10 Race
1 – THRUST BEARING AND RACE
Fig. 140 Aligning Second Brake Drum And Clutch
Pack Teeth
1 – SECOND BRAKE DRUM
2 – CLUTCH PACK
3 – ALIGN DRUM AND CLUTCH PACK TEETH
Fig. 141 Output Shaft/Rear Planetary Assembly
Installation
1 – ALIGN CLUTCH/DRUM TEETH WITH CASE SLOTS
2 – CASE SLOTS
Fig. 142 Planetary Snap Ring Installation
1 – REAR PLANETARY SNAP RING
21 - 282
AW–4 AUTOMATIC TRANSMISSION
XJ
DISASSEMBLY AND ASSEMBLY (Continued)