Quickie Q2 Lite Construction Manual - page 21
•
5/8" Spotface
PACKING LISTS
.....
Upon receiving your Q2 kit, you should immediately match the packing
list in each shipment against the actual contents of each box. Any
discrepancies should be reported immediately to Quickie Aircraft
Corporation. We will not be responsible for shortages that go unreported
for longer than 30 days after receipt of the materials.
.....
Quickie Aircraft Corporation maintains a close liaison with Q2
subcontractors to assure proper materials specification and quality
control. Do not make substitutions for the materials provided. The
materials provided were selected, developed, tested, and optimized for
ease of construction and structural integrity. If you insist on making
non-approved substitutions for replacement and spoilage, we insist that
you do not call your aircraft a Q2. Quickie Aircraft Corporation will not
provide assistance in the application of substitute materials or
components.
.....
In addition to the materials provided in the kit, you will need to
furnish a few items that are readily available locally. We do this to
save you some money. These items are as follows:
•
Lumber for a workbench and jigging
•
Masonite, hardboard, plywood, etc. for jigging
•
templates, rigging templates, and hot-wire templates
•
12" piece of 1/4" diameter wood dowel
•
6" x 6" piece of aluminum screen door screen .Battery for
electrical system
•
Finishing materials: Dupont 70S dark gray laquer primer surfacer,
Acrylic laquer paint "in the color of your choice
•
1 piece shock cord, 3- 4" unstretche d length
END OF CHAPTER
PAGE 2-1