Quickie Q2 Lite Construction Manual - page 245
INSIDE LAMINATION
.....
Then mark the 10 locations for the fasteners. Remove the inside
shell skin and core foam as shown at the 10 locations. The taper shown
is to allow the next laminations to flow smoothly around the corners.
Each location will have an area 1” x 211 on each shell (a total of 2” x
2”) sanded down to the outside shell skin, as shown. Note from the
sketches that only the area around each fastener location is affected.
If the FS94 bulkhead interferes with the lower 3 locations, slot the
FS94 bulkhead as needed, and then replace the materials.
.....
A pad of BID is laminated at each location and on each shell. A
total of 9 BID approximately 1” x 2” are used. An additional 3 BID
overlapping 1" minimum onto the inside shell skin are laminated to tie
everything together. It is important to taper all laminations carefully
to avoid joints, bumps, joggles, etc. Also, these laminations are
oriented 45 degrees to the joint line.