Quickie Q2 Lite Construction Manual - page 4
Q2 Builder Tip Notices (Q2BT9) are intended to provide clarification,
guidance, improved construction methods, and helpful hints of a non-
mandatory nature. The builder, at his discretion may use or discard
any Q2BT. Most are a result of work accomplished at Quickie Aircraft
Corporation building a Q2 from the Q2 Construction Plans. Any
questions on a Q2BT notice should be referred to Quickie Aircraft
Corporation. Each Q2BT has a number and a publication date along with
a description of the builder tip.
NUMBER
DATE
DESCRIPTION
Q2BT9
1 July, 1981
Q2 CONSTRUCTION PLANS -
SECTION I: Some plan sets sent
out may have faint re-
production on parts of pages
9-8, 10-1, 10-2, 10-3, 11-4,
14-2, and Appendix Sheet 4. We
intend to have those sections
reprinted within 30 days. We
will send the reprinted sheets
to any builder who reports
this problem.
Q2 Plans Change Notices (Q2PC9 & Q2PC10) are mandatory revisions to
the Q2 plans. Each Q2PC has a number and a publication date along
with a description of the change. All Q2PC notices should be
incorporated into the builder's set of Q2 Construction Plans
immediately upon receipt by the builder. Any questions on a Q2PC
notice should be referred to Quickie Aircraft Corp.
NUMBER
DATE
DESCRIPTION
Q2PC9
1 July, 1981
Q2 GROUND ANGLE OF ATTACK:
With the aircraft assembled
and WL15 level, and with the
aircraft on a reasonable level
floor, take a measurement
vertically between the floor
and the bottom of the
tailwheel. The nominal
measurement should be 27". A
range from 25" to 28.6" should
be Acceptable. This limitation
is to assist tailwheel first
landings and
three point takeoffs at
mid/forward c.g. Small change
can be effected by changing
the tailwheel diameter. It is
a good idea to delay mounting
the tailspring until the
aircraft is assembled, so that