Quickie Q2 Lite Construction Manual - page 9
.....
BS4
is mounted in position with flox and 2 BID tapes to the top of the fuel
tank near the left side console. Position the BS4 so that the handle
will be an easy and comfortable reach for the pilot and so it will not
interfere unnecessarily with pilot comfort.
.....
Next, install the Brake Handle as shown in the sketch.
.....
The Brake Equalizer is used to help proportion braking
effectiveness equally. The turnbuckle assembly on the left side must be
attached directly to BS5 because of the proximity of the cable to the
left elevator slot foam core. The turn buckle for the right side can be
mounted in the system outboard of the Canard shear web pulley.
The two BS3 Canard shear web pulley mounts shown on page 11-4 must be
modified in location for the proper angles.
The cable routing is from the BS5 Brake Equalizer around the two pulleys
on the canard shear web, and then outboard through the Elevator slot
foam cores as originally indicated.
....
The turnbuckles are adjusted to provide equal braking on each wheel.
iv