Intergraph TD-300 Maintenance Manual - page 72
58 Chapter 4 - Maintaining the System
18.
Install the CPUs onto the new system board. The CPU sockets are
keyed to ensure proper insertion. For the secondary CPU, lower the
lever to lock the CPU in the socket.
19.
Replace the CPU brace for each CPU. Ensure each end of the brace
fully engages the socket tabs.
20.
Set the CPU frequency jumpers on the new system board to the same
configuration as the old system board. The CPU jumpers are the eight
jumpers between the VRMs.
21.
Remove the Voltage Regulator Modules (VRMs) from the system
board and install them on the new system board. Press the tabs on
either side of the VRM to disengage the VRM from the socket.
Ensure the tabs lock into the slots when installing the VRMs on the
new system board.
22.
If a WRAM expansion module is installed, remove the module and
install it onto the new system board.
Brace
VRM Jumpers
VRM Socket Tabs
Heat Sinks
VRM
CPU
ZIF Socket