System > Units
The Units page sets a descriptive system name for each PRO2 unit, configures asset management identification,
determines outlet sequence, and sets the display orientation of the mounted unit. The page also sets sets SNMP
Trap and Email notifications for unit events.
The Purge and Restore link on the Units page displays another page to allow the clearing of current values in non-
volatile (NV) memory from individual units, and the resetting of those values back to factory defaults.
To configure the PRO2 unit
:
1.
(Optional) Provide an asset tag identification for listed master and/or link units and check the Identity
checkbox.
2.
In the Unit Name field, provide a descriptive text name for the unit, from 0-32 characters. The ID is a
system-assigned internal name and cannot be changed.
3.
For Switched products, the PRO2 allows configuration of the power-on sequence of the outlets with the
following available options. From the Outlet Sequence drop-down menu, select an option:
• Normal: (Default) Powers on outlets in ascending numeric order by outlet number, for example,
from outlet 1-8.
• Reversed: Powers on outlets in descending order by outlet number; for example, from outlet 8-1. The
Reversed option is useful when the PRO2 is mounted with inverted orientation and the last outlet (in
this example, outlet 8) is in the first position.
4.
From the Display Orientation drop-down menu, select an option:
• Normal: Sets the LED display to be right-side up (for vertical mounting of the unit), and outlet
sequencing to be 1 to n.
• Inverted: Sets the LED display to be upside down.
• Auto (Default): Sets automatic LED display orientation using internal orientation sensor.
5.
For each unit listed on the page, check (or uncheck) the SNMP Trap Notifications and/or Email