Jeep Cherokee 2000 Service Manual - page 1324
ASSEMBLY
Refer to (Fig. 74) while assembling and installing
the shift rail components. Also, verify that all shift
rail components are in their neutral position when
installing the check balls and interlock pins.
(1) Install the 3–4 shift rail into the intermediate
plate.
(2) Install the 1–2 elongated check ball into the
intermediate plate (Fig. 75).
(3) Install the interlock pin into the 1–2 shift rail
(Fig. 76).
(4) Install the 1–2 shift rail into the intermediate
plate.
Fig. 74 Shift Rail Components
1 – 3–4 FORK
2 – 3–4 SHIFT RAIL
3 – 1–2 FORK
4 – INTERMEDIATE PLATE
5 – FIFTH GEAR FORK
6 – FIFTH GEAR SHIFT RAIL
7 – 1–2 SHIFT RAIL
8 – REVERSE SHIFT RAIL
Fig. 75 Install 1–2 Check Ball
1 – 1–2 CHECK BALL
2 – 3–4 SHIFT RAIL
21 - 24
AX5 MANUAL TRANSMISSION
XJ
DISASSEMBLY AND ASSEMBLY (Continued)