Jeep Cherokee 2000 Service Manual - page 255
(2) Install new o-ring in the flywheel mounting
flange (Fig. 14). Use grease to hold the ring in place.
(3) Install the flywheel on the crankshaft and
align the bolt holes.
(4) Install and tighten the new flywheel bolts as
follows:
(a) Lubricate and install the 6 new flywheel
bolts.
(b) Torque the 6 flywheel bolts to 49 N
•
m (36 ft.
lbs.) starting with one bolt and following with the
opposite one (cross tightening) until completion, in
a clockwise direction (Fig. 15).
(c) Loosen one bolt at a time and tighten to 19.6
N
•
m (14 ft. lbs.) plus 75° using the cross tighten-
ing method until completion.
(5) Install the clutch cover and disc (Fig. 16). Refer
to clutch cover and disc removal and installation pro-
cedure in this section.
(6) Install the transmission and transfer case.
Refer to Group 21, Transmission and Transfer Case
for removal and installation procedure.
Fig. 13 Checking Flywheel Runout
1 – DIAL INDICATOR
2 – FLYWHEEL FACE
Fig. 14 Flywheel Mounting (VM Diesel)
1 – O-RING
2 – PILOT BEARING HOUSING
3 – FLYWHEEL
4 – STARTER RING GEAR
Fig. 15 Cross Tightening Method
Fig. 16 Clutch Cover (Pressure Plate) View
1 – VEHICLE UNDERBODY
2 – ENGINE SPEED SENSOR
3 – PRESSURE PLATE RETAINING BOLTS
4 – CLUTCH COVER (PRESSURE PLATE)
5 – ENGINE OIL PAN
6 – PRESSURE PLATE RETAINING BOLTS
6 - 6
CLUTCH
XJ
REMOVAL AND INSTALLATION (Continued)