Jeep Cherokee 2000 Service Manual - page 1695
BEARING AND SEAL INSTALLATION
(1) Remove snap-ring that retains front output
shaft front bearing in case (Fig. 48). Then remove
bearing. Use hammer handle, or hammer and brass
punch to tap bearing out of case.
(2) Install new front output shaft front bearing
with Tool Handle C-4171 and Installer 8033A with
the tapered cone upward (Fig. 49).
(3) Install front bearing snap-ring (Fig. 48).
(4) Remove front output shaft seal using an appro-
priate pry tool (Fig. 50) or slide-hammer mounted
screw.
(5) Install new front output shaft oil seal with
Installer 6952-A (Fig. 51).
Fig. 48 Front Output Shaft Front Bearing Snap-Ring
Removal
1 – FRONT BEARING SNAP RING
Fig. 47 Mainshaft And Sprocket Gear Removal
1 – MAINSHAFT GEAR
2 – SPROCKET GEAR
3 – BOTTOM CASE
Fig. 49 Front Output Shaft Front Bearing Installation
1 – SPECIAL TOOL C-4171
2 – SPECIAL TOOL 8033A
Fig. 50 Remove Front Output Shaft Seal
1 – OUTPUT SHAFT SEAL
2 – PRYBAR
21 - 390
NV242 TRANSFER CASE
XJ
DISASSEMBLY AND ASSEMBLY (Continued)