NEC SV8500 Operation And Maintenance Manual - page 127
– 80 –
CHAPTER 2
Operations of SV8500 Server
STEP 4
Loosen the screws on the EXB card.
STEP 5
Remove the cable support bracket.
STEP 6
Pull the EXB card slowly toward you.
STEP 7
Insert the new EXB card by placing it on the slots of the server, and then securely insert into the
connector provided on the server.
STEP 8
Place the both ends of the cable support bracket on the screws.
STEP 9
Fasten the cable support bracket on the EXB card by tightening the screws.
STEP 10 Insert the bus cable to the connector again.
STEP 11 Turn on the PIR (s) and TSWR when they are accommodated. If not skip this step.
Turn on the power (PWR/DPWR cards) in the following order.
•
PIR0
5
PIR1
5
PIR2
5
PIR3 (smaller number PIR first)
Turn on the power (PWR/DPWR cards) in the following order.
•
TSWR
•
PIR0
o
PIR1
o
PIR2
o
....
o
PIR15 (smaller number PIR first)
STEP 12 Turn on the SV8500 server.
•
Turn on “Power” switch (press the right side of the switch) on the Power module.
STEP 13 Make sure that the system is placed in normal operation.
•
“PWR” lamp on the CPU card lights green.
•
“SYS 0” side “ACT” lamp on the EMA card lights green.
PWR
ACT
EXB card
screw
D37 SC50 CA-A / D37 SC50 CA-B
Cable support
bracket
screw
PIR/TSWR connector