NEC SV8500 Operation And Maintenance Manual - page 627
– 580 –
CHAPTER 5
Operation Procedure for System with PIR
STEP 9: Replace the FANC.
•
Turn OFF (upper) the FAN Power Switch on the new FANC.
•
FANC and the bracket must be replaced.
STEP 10: Mount the new FANC to the FANU. (in reverse order shown above)
•
Place the FANC bracket on the FANU so that the loosed screw at the right side may come through the big
hole of the right bracket.
•
Slide the brackets to the left a little. (about 1cm)
•
Tighten the screws with a flat-blade screwdriver, and fix the brackets.
STEP 11: Connect the FAN cables to the FAN connectors (FAN0 - FAN2).
•
Insert the FAN cables to the point where it clicks.
•
Fix the FAN cables on the cable support.
STEP 12: Reconnect the cables to the FANU connector, and tighten the screws with a flat-blade screwdriver.
STEP 13: Turn ON (downward) the FAN Power Switch.
•
Check all the FANs are operating normally.
Note:
If FANs do not operate normally, check the cables connections.
STEP 14: Return the FAN cover to the FANU.
STEP 15: Return the front cover of the rack (PIR/TSWR) located just below the FANU.
[END]