NEC SV8500 Operation And Maintenance Manual - page 955
– 908 –
CHAPTER 7
Maintenance Commands
SINZN: System Initialize for the FCCS Network
1. Functional Outline
This command is used to simultaneously initialize the SV8500 systems on the same FCCS (Fusion) network.
At the time of each system initialization, specify whether to load the Program/Office Data, depending on the
data setting below.
2. Parameters
Input Data
TYPE:
System Initialize
Office Data Load & System Initialize
Program Load & System Initialize
Program & Office Data Load & System Initialize
OPTION:
Phase 1 Restart: Calls in progress are held during system initialization.
Note 1:
Regardless of using or not using the Redundant Data Memory Backup on an Individual Hard Drive func-
tion, the affected Hard Disk Drive is fixed to the following:
For Program Load: Drive A
For Office Data Load: Drive B
By using this command (SINZN), Drive Selection of Drive C or Drive D is not available.
Buttons
Execute: Execute the specified system initialization.
Exit: Exit this command.
Note 3:
When the system initialization is executed by this command, PCPro is disconnected. After initialization
is complete, log back into PCPro.