NEC SV8500 Operation And Maintenance Manual - page 595
– 548 –
CHAPTER 4
Fault Repair Procedures
•
SP block (for SIP Station): Use CMOD command. TP and this block change over in combination.
•
SP block (for other than IP Station): load sharing (N + 1), both SPs are placed in ACT.
(4) Non-load Initial
(a) Use SINZ from the PCPro.
(5) Office Data load Initial
(a) Use SINZ from the PCPro.
Note:
Proceed to the next step if this load initialization cannot be executed using this method.
(6) Office Data & Program load Initial
(a) Execute the Office Data & Program load initialization by using SINZ from the PCPro.
Note:
Proceed to the next step if this load initialization cannot be executed using this method.
(7) Power OFF/ON
(a) This is to be executed only when above initialization does not work.
Note:
For more details, see “How to Turn ON/OFF Whole System“in Chapter 5.
(8) Program Reinstall
(a) Reinstall the program by referring to Program Install procedure of Installation Manual.
(b) Execute the Load initialization by referring to (5).
The following operations require system shutdown. Perform the following only when system
shutdown is permitted.
WARNING