NEC SV8500 Operation And Maintenance Manual - page 130
– 83 –
CHAPTER 2
Operations of SV8500 Server
STEP 7
Insert the new EXB card by placing it on the slots of the server, and then securely insert into the
connector provided on the server.
STEP 8
Place the both ends of the cable support bracket on the screws.
STEP 9
Fasten the EXB card by tightening the two screws onto the server.
STEP 10 Insert the bus cable to the connector again.
STEP 11 Make sure that the newly replaced EXB card is operating normally in the system.
•
“PWR” lamp lights green on the EXB card.
Note:
If the lamp does not light green, make sure that the EXB card is securely inserted into the main unit.
STEP 12 Switch over the CPU ACT/STBY to test the newly replaced EXB card.
•
Use CMOD command from PCPro.
•
Place test calls using stations / trunks accommodated in PIR.
•
Confirm whether any system messages related fault are output or not. Use DFTD from PCPro.
Note:
If any fault is found, check the following:
- EXB card is securely inserted into the main unit?
- Bus cable is securely inserted into the connector?
[End]