Canon imagePRESS C1 Service Manual - page 357
Chapter 7
7-8
F-7-8
7.3 Basic Sequence
7.3.1 When Turning the Power ON
0012-6528
imagePRESS C1 P / imagePRESS C1
In case of turning on the main power switch when the temperature of the fixing roller surface is under 50 deg C. (when turning on the main power switch after
leaving it for a long time, e.g., in the morning)
1. Feature
- Right after starting the sequence, execute the HP detection of the developing rotary and eliminate static from the drum surface.
- The approximate time required from turning on the main power switch to being the standby state is about 9min 10sec. (max. time is less than 11min 40sec)
- During the warm-up rotation, the following controls are executed:
Wire cleaning, potential control, primary/secondary transfer ATVC control, ITB cleaner ACVC control, ATR patch control, development idle rotation control,
D-half control *1
*1: Execute the control if there is the history of more than 500 sheets color printing, or when the environment is changed.
4. Fixing Block
3.Transfer Block
1.Electrostatic Latent Image Formation Block
Delivery
[9]
Registration
Pickup
ITB
Photosensitive Drum
[7]
[11]
5. ITB Cleaning
Block
[10]
[8]
[4]
7.Photosensitive
Drum Cleaning Block
2.Developing
Block
[12]
[5]
[1]
[3]
[2]
[6]
6.Cleaning Block
of Secondary
Transfer Block