3Com S7902E Command Reference Manual - page 2259
1-14
z
It is not allowed to enter test group view or test type view after a test group is scheduled.
z
At present, the configuration of the end time of an NQA test is not supported on the device, and you
need to use the
undo nqa schedule
command to end an NQA test.
Examples
# Start a test for the test group with the administrator name
admin
and operation tag
test
.
[Sysname] nqa schedule admin test start-time now lifetime forever
operation (FTP test type view)
Syntax
operation
{
get
|
put
}
undo operation
View
FTP test type view
Default Level
2: System level
Parameters
get
: Obtains a file from the FTP server.
put
: Transfers a file to the FTP server.
Description
Use the
operation
command to configure the FTP operation type.
Use the
undo operation
command to restore the default.
By default, the FTP operation type is
get
.
Examples
# Configure the FTP operation type as
put
.
[Sysname] nqa entry admin test
[Sysname-nqa-admin-test] type ftp
[Sysname-nqa-admin-test-ftp] operation put
operation (HTTP test type view)
Syntax
operation
{
get
|
post
}
undo operation
View
HTTP test type view